INFRASTRUCTURE FOR INSTALLATION OF PRODUCTION / POWER, GAS, EXHAUSTION AND COMPRESSED AIR FOR FIFTEEN 25-TON HYDRAULIC PRESSES.

  • Electro-mechanical structure for start-up of production on a turn key basis.
  • Utility hook-up and start up of production lines.
  • Moving, mounting, installation and star-up of fifteen 25-ton hydraulic presses.

INFRASTRUCTURE FOR INSTALLATION OF PRODUCTION EQUIPMENT / 1500 KVA SUBSTATION, 480 V 2000 AMP POWER CIRCUIT, ELECTRIC DUCTS, CONTROL PANELS AND COOLING WATER CIRCUIT (200 METERS).

  • Installation of one 1500 KVA substation, distribution panel, transformer and cells.
  • Manufacture of main rack for 125 meters of supply lines, to client specifications.
  • Unloading, mounting, installation and integration of twenty molding machines weighing 125, 150 and 250 tons.

INSTALLATION OF CCTV THROUGH 3/4” AND 1” TYPE 40 PIPELINE, WITH EXPLOSION PROOF SYSTEM (2500 METERS).

  • Installation of a closed circuit TV system through type 40 pipeline (including explosion proof system).
  • Supply and mounting of eighty 100 mm diameter, 9 meter high steel poles.
  • Concrete foundation included.
  • Engineering and construction of the networks and manholes for future expansion.

SYSTEMS FOR RECYCLING PROCESS WATER (450 METERS) / INSTALLATION OF POWER SYSTEMS FOR PRODUCTION LINE ROBOT, CONSTRUCTION OF NEW TESTING FACILITIES IN 150 SQUARE METERS.

  • Engineering for the water recycling circuit for testing stations, to client specifications.
  • Installation of the hydraulic system, 2.5 hp pumping equipment and storage tanks.
  • Hydrostatic testing and pipeline certification.

CALCULATION, SUPPLY AND INSTALLATION OF THREE BANKS OF CAPACITORS OF 157.5 KVAR FOR REGULATION OF ELECTRICAL POWER FACTOR. ENGINEERING, CALCULATION, SUPPLY AND INSTALLATION OF ONE 750 KVA SUBSTATION.

  • Construction.
  • Installation and interconnection to main panel.
  • Processing of licenses with CFE and filing for verification.

DESIGN AND INSTALLATION OF HEAT EXCHANGE SYSTEM FOR PROCESS WATER.

  • Engineering for the heat exchange systems for process water, to client specifications.
  • Installation of hydraulic system, 15 hp pumps for 3-bar pressure and pressure management equipment.
  • Hydrostatic testing and pipelines certification..

ENGINEERING, CALCULATION AND INSTALLATION OF PIPELINES AND INFRASTRUCTURE AND PIPELINE FOR MAIN GAS FACILITIES.

  • Construction work to CFE standards.
  • Installation and connection of pipelines to main system circuit.
  • Licenses from gas company, verification and documentation.

RELOCATION OF TWO 2-TON PRESSES: FROM U.S.A. PLANT TO MONTERREY..

  • Tagging of cables and components for disconnection.
  • Disconnection, disassembly and shrink film wrapping of equipment, loading onto trucks for shipment.
  • Installation, moving, assembly and connection of equipment.
  • Installation and connection of utilities.
  • Testing of machine cycles.

RELOCATION OF AUTOMATED PRODUCTION LINE: U.S.A. TO MONTERREY.

  • Tagging of cables and components for disconnection.
  • Disconnection, disassembly and shrink film wrapping of equipment and loading onto trucks for shipment.
  • Installation, moving, assembly and connection of equipment.
  • Installation and connection of utilities.
  • Integration of panels and PLC controllers for equipment start-up.
  • Machine cycle tests.